Mabey Bridge Wind Turbine Facility
Supply & Installation of 18” Gas Main. Pipework designed and calculated in house

Project Description
Supply & Installation of 18” Gas Main. Pipework was designed and calculated in house. L&J installed a new plastic main pipe in the ground up to the new building. L&J manufactured the new 12 metre lengths of pipework and fitted it up into and through the new building to the ovens at far end of the building, 160 metres distance away. L&J supplied and fitted all new isolation valves and carried out certification of the line when completed.